|
To
order by phone:
(801) 374-6214 To order by fax: (801) 374-0634 To order by email. or for questions: Click here.
|
345R-91
The durabiliy and maintenance costs of concrete highway bridge decks are highly dependent upon the care exercised during the construction phase, including attendant activities during the preconstruction and post-construction periods. Recommendations relative to these periods are presented, covering the areas of design considerations, inspection, pre-construction planning, falsework and formwork, reinforcement, concrete materials and properties, measuring and mixing, placing and consolidation, finishing, curing, postconstruction care, and the use of overlays. Contents: Chapter 1 -- Introduction 1.1 -- General 1.2 -- Roughness 1.3 -- Cracking 1.4 -- Spalling 1.5 -- Scaling 1.6 -- Slipperiness 1.7 -- Summary
2.1 -- General 2.2 -- Drainage 2.3 -- Deck thinkness 2.4 -- Cover 2.5 -- Arrangement of Reinforcement 2.6 -- Positive protective systems 2.7 -- Skid resistance and surface texture joint-form materials 2.8 -- Joint forming materials
3.1 -- General 3.2 -- Inspection personnel 3.3 -- Inspection functions
4.1 -- Construction schedules 4.2 --Coordination of construction and inspection 4.3 -- Review of construction method 4.4 -- Manpower requirements and qualifications 4.5 -- Equipment requirements 4.6 -- Specialty concretes
5.1 -- General considerations 5.2 -- Consideration for type of form 5.3 -- Materials 5.4 -- Removal 5.5 -- Workmanship
6.1 -- General considerations 6.2 -- Arrangement 6.3 -- Reinforcement support and ties 6.4 -- Cover over steel 6.5 -- Cleanliness 6.6 -- Epoxy-coated reinforcing steel
7.1 -- General 7.2 -- Materials 7.3 -- Properties of concrete
8.1 -- General 8.2 -- Reference documents 8.3 -- Measuring materials 8.4 -- Charging and mixing 8.5 -- Control of mixing water and delivery 8.6 -- Communication
9.1 -- General considerations 9.2 -- Transportation 9.3 -- Rate of delivery 9.4 -- Placing equipment 9.5 -- Vibration and consolidation 9.6 -- Sequence of placing 9.7 -- Manpower requirements and qualifications 9.8 -- Reinforcement--Special care during placing 9.9 -- Reference documents
10.1 -- General 10.2 -- Timing of operations 10.3 -- Manual methods 10.4 -- Finishing aids 10.5 -- Mechanical equipment 10.6 -- Texturing 10.7 -- Correction of defects
11.1 -- General considerations 11.2 -- Curing methods 11.3 -- Time of application 11.4 -- Duration 11.5 -- Related information
12.1 -- General 12.2 -- During Continuing Construction 12.3 -- Construction Associated Preventive Maintenance
13.1 -- Scope 13.2 -- Need for overlays 13.3 -- Required properties of overlays 13.4 -- Types of overlays 13.5 -- Design considerations 13.6 -- Construction considerations 13.7 -- Other considerations |
ACI
|