|
To
order by phone:
(801) 374-6214 To order by fax: (801) 374-0634 To order by email. or for questions: Click here.
|
506.2-95
This specification contains the construction requirements for the application of shotcrete. Both wet-mix and dry-mix shotcrete are specified, and the minimum standards for testing, materials, and execution are provided. Contents: Preface to Specification Checklist Mandatory requirements checklist Optional requirements checklist Submittals checklist
1.1--Scope 1.2--Definitions 1.3--Reference organizations 1.4--Reference standards 1.5--Submittals 1.6--Quality assurance 1.7--Shotcrete core grades 1.8--Evaluation of in-place shotcrete 1.9--Acceptance
2.1--Cements 2.2--Aggregates 2.3--Reinforcement 2.4--Water 2.5--Admixtures 2.6--Curing materials 2.7--Proportioning 2.8--Fiber reinforced shotcrete 2.9--Prebagged materials 2.10--Delivery, storage, and handling
3.1--Examination 3.2--Batching and mixing 3.3--Surface preparation 3.4--Joints 3.5--Alignment control 3.6--Application 3.7--Finishing 3.8--Curing 3.9--Hot weather shotcreting 3.10--Cold water shotcreting 3.11--Protection 3.12--Tolerances |
ACI
|