Evaluation of in-place shotcrete requires experience, education, and engineering judgement. This document serves as a guide for engineers, inspectors, contractors, and others involved in accepting, rejecting, or evaluating in-place dry or wet mix shotcrete. Contents:
2.1 General 2.2 Destructive testing 2.3 Nondestructive testing
3.1 General 3.2 Sounding 3.3 Direct tension (tensile bond) 3.4 Sonic and radar methods 3.5 Infrared thermography 3.6 Radiography
4.1 General 4.2 Density
5.1 General 5.2 Permeability tests
6.1 General 6.2 Tests applicable for wet process shotcrete 6.3 Test applicable for dry mix process shotcrete
7.1 General 7.2 Sampling 7.3 Test procedure
|